-
[1]
. BEPC/ Preliminary Design Report, 20022. Preliminary Design Report of the BES0 Detector, Jan,20043. BaBar Technical Design Report, SLAC-REP-950457. 19954. LI Wei-Dong, LIU Huai-Min et al. The Oine Software forthe BES0 Experiment. Proceeding of CHEP06. Mumbai,20065. WANG Da-Yong et al. Kalman Track Fitting for BES0.Nuclear Electronics Detection Technology, accepted(in Chinese)(王大勇等.核电r学与探测技术(已接收))6. Agostinelli S et al(Geant 4 Collaboration). Nucl. Instrum.Methods, 2003, A506: 2507. DENG Zi-Yan et al. HEP NP, 2006, 30(5): 371-377(in Chinese)(邓子艳等.高能物理与核物理,2006, 30(5): 371-377)8. LIU Jian-Bei et al. Nucl. Instrum. Methods, 2006, A557:436-4449. Robert Kutschke, Anders Ryd. Billoir Fitter for CLEO II,CBX 96-20. 199610. BAI J Z et al(BES Collaboration). Nucl. Instrum. Methods,2001, A458: 62711. DENG Zi-Yan et al. HEP NP, 2003, 27(10): 909-913(in Chinese)(邓子艳等.高能物理与核物理,2003, 27(10): 909-913)12. BAI J Z et al(BES Collaboration). Phys. Rev. Lett., 2004,92: 052001