-
[1]
Feasibility Study Report on Beijing Tau–Charm Factory,IHEP–BTCF Report–03, Oct.19962 The Belle Collaboration. Tecnnical Design Report, KEK Report 95–1 3 The BarBar Collaborattion. Technical Design Report, SLAC–457, 1994 4 Honscheid K et al. Nucl. Instr. and Meth. in Phys. fos., 1994, A343:3065 Xichimi H et al. Nucl. Instr. and Meth. in Phys. Res., 1996, A371:91