• [1]

    E Cerron-Zeballos, J Choi, D Hatzifotiadou et al, Nucl. Instrum. Methods A, 434(2):362-372(1999)

  • [2]

    H. F. Chen, C. Li, X. L. Wang et al. High Energy Physics and Nuclear Physics, 26(3):201-206(2002)(in Chinese)

  • [3]

    J. Wu, B. Bonner, H. F. Chen et al, Nucl. Instrum Methods A, 538:243-248(2005)

  • [4]

    H. H. Fan, C. Q. Feng, W. J. Sun et al, IEEE Trans. Nucl. Sci., 60(5):3563-3569(2013)

  • [5]

    https://www.slac.stanford.edu/BFROOT/www/Detector/linebreakDAQ/Fast_Cntrl_Tim_System/fcts3_0.ps, retrieved 24th March 2016

  • [6]

    J. Christiansen, A. Marchioro, P. Moreira et al, Receiver ASIC for Timing, Trigger and Control Distribution in LHC Experiments, in Nuclear Science Symposium and Medical Imaging Conference Record, edited by E. Barsotti. Piscataway (USA:San Francisco, 1995), p. 597-601

  • [7]

    B.G. Taylor, IEEE Trans. Nucl. Sci., 45(3):821-828(1998)

  • [8]

    K. Wang, Design of BESⅢ Trigger Fast Control System, Ph.D. Thesis(HeiFei:University of Science and Technology of China, 2006)(in Chinese)

  • [9]

    X. Z. Liu, S. B. Liu, W. Zheng et al, Journal of Jilin University, 38(2):483(2008)(in Chinese)

  • [10]

    C. F. Ye, L. Zhao, S. B. Liu et al. Rev. Sci. Instrum, 85(4):045115(2014)