[1] |
Jian-Yong Zhang
, Xiao Cai
, Xiao-Hu Mo
, Di-Zhou Guo
, Jian-Li Wang
, Bai-Qi Liu
, M. N. Achasov
, A. A. Krasnov
, N. Yu. Muchnoi
, E. E. Pyata
, E. V. Mamoshkina
, F. A. Harris
. Upgrade of beam energy measurement system at BEPC-Ⅱ. Chinese Physics C,
2016, 40(7): 076001.
doi: 10.1088/1674-1137/40/7/076001
|
[2] |
Jing-Hui Pan
, Chang-Li Ma
, Xue-Yu Gong
, Zhi-Jia Sun
, Yan-Feng Wang
, Chen-Yan Yin
, Lei Gong
. Development of a portable and fast wire tension measurement system for MWPC construction. Chinese Physics C,
2016, 40(9): 096201.
doi: 10.1088/1674-1137/40/9/096201
|
[3] |
ZHU Hong-Yan
, DONG Lan
, LI Bo
. Design and simulation of a wire position monitor for cryogenicsystems in an ADS linac. Chinese Physics C,
2014, 38(8): 087001.
doi: 10.1088/1674-1137/38/8/087001
|
[4] |
WU Dai
, YANG Ren-Jun
, BAI Wei
, LI Peng
, LI Ming
, YANG Xing-Fan
. Design study of an improved laser wire system for electron beam measurement. Chinese Physics C,
2013, 37(10): 108101.
doi: 10.1088/1674-1137/37/10/108101
|
[5] |
LI Xian-Li
, ZHANG Yun-Long
, QIAN Hao
, XU Zi-Zong
, WANG Xiao-Lian
. Delay line readout of a large dimension multi-wire proportional chamber. Chinese Physics C,
2012, 36(6): 519-524 .
doi: 10.1088/1674-1137/36/6/007
|
[6] |
LIU Yu-Dong
, YUE Jun-Hui
, WANG Na
. Studies on electron cloud instability in BEPCⅡ. Chinese Physics C,
2009, 33(S2): 71-74.
doi: 10.1088/1674-1137/33/S2/018
|
[7] |
HAN Li-Ying
, LI Qi-Te
, Q. Faisal
, GE Yu-Cheng
, LIU Hong-Tao
, YE Yan-Lin
. Study of a multi-wire proportional chamber with a cathode strip and delay-line readout. Chinese Physics C,
2009, 33(5): 364-368.
doi: 10.1088/1674-1137/33/5/009
|
[8] |
ZHANG Chuang
. BEPCⅡ: construction and commissioning. Chinese Physics C,
2009, 33(S2): 60-64.
doi: 10.1088/1674-1137/33/S2/016
|
[9] |
WU Ling-Hui
, WANG Yi-Fang
, CHEN Yuan-Bo
, LIU Jian-Bei
, LIU Rong-Guang
, MA Xiao-Yan
. A study of the calibration of wire positions for the BESⅢ drift chamber using physics data without magnetic field. Chinese Physics C,
2008, 32(4): 264-268.
doi: 10.1088/1674-1137/32/4/005
|
[10] |
LI Gang
, ZHAO Ji-Jiu
, WANG Ke-Xiang
, YUE Ke-Juan
. Research of Cryogenic Control System at BEPCⅡ. Chinese Physics C,
2008, 32(S1): 83-85. |
[11] |
LI Gang
, WANG Ke-Xiang
, ZHAO Ji-Jiu
, YUE Ke-Juan
, DAI Ming-Hui
, HUANG Yi-Ling
, JIANG Bo
. The cryogenic control system of BEPCⅡ. Chinese Physics C,
2008, 32(4): 294-296.
doi: 10.1088/1674-1137/32/4/011
|
[12] |
SUI Yan-Feng
, MA Hui-Zhou
, CAO Jian-She
, MA Li
. Design and simulation of the wire scanner for the injector linac of BEPCⅡ. Chinese Physics C,
2008, 32(5): 397-399.
doi: 10.1088/1674-1137/32/5/015
|
[13] |
WANG Chun-Hong
, WANG Xiao-Li
, LIU Jia
, SHI Hao-Li
, GAN Quan
, LIU Shu
, ZHAO Ji-Jiu
. BEPCⅡ Magnet Power Supply Control System. Chinese Physics C,
2007, 31(1): 91-95. |
[14] |
GEN Zhe-Qiao
, HOU Mi
, PEI Guo-Xi
. PAD Design for the Phasing System of BEPCⅡ Linac. Chinese Physics C,
2006, 30(2): 151-154. |
[15] |
LIU Bo
, GU Meng-Ping
, WANG Shu-Hong
, CHI Yun-Long
, YANG Xing-Wang
, TIAN Shuang-Min
, LIU Wei-Bin
, YE Qiang
. Experiment and Operation of BEPCⅡ Electron Gun System. Chinese Physics C,
2006, 30(5): 466-469. |
[16] |
ZHAO Feng-Li
, HOU Mi
, ZHAO Yan-Ping
, LIU Jin-Tong
, ZHANG Jing-Ru
, ZHOU Yao-Xiang
, HAN Da-Wei
. Microwave System for BEPCⅡ-Linac. Chinese Physics C,
2006, 30(2): 155-158. |
[17] |
ZHAO Ji-Jiu
, WANG Chun-Hong
, LEI Ge
, GAO Wen-Chun
, WANG Xiao-Li
, LI Gang
, YUE Ke-Juan
, ZHAO Zhuo
, LIU Jia
, XU Shi-Fu
, HUANG Song
, XUE Peng
, KONG Deng-Ming
, MA Mei
, WANG Jin-Can
, XU Guang-Lei
. BEPCⅡ Control System. Chinese Physics C,
2006, 30(11): 1100-1106. |
[18] |
YUAN Ren-Xian
, YUE Jun-Hui
, CAO Jian-She
, MA Li
. Simulation of BEPCⅡ′s BPM. Chinese Physics C,
2004, 28(6): 664-668. |
[19] |
Ma Li
, Shi Ping
, Ye Kairong
. Upgrade of BPM System for the BEPC Storage Ring. Chinese Physics C,
1998, 22(5): 475-480. |
[20] |
Pei Guoxi
, Xie Jialin
, Zhou Shu
, Sun Songlan
. Optimization of the BEPC Positron Source. Chinese Physics C,
1990, 14(S2): 125-134. |