Design and Construction of the Plugged-in 22Na Based Slow Positron Beam Facility

  • The Beijing intense slow positron beam facility has restricted running time of the BEPC-LINAC designed for BES and BSRF operation, We have therefore designed and constructed the plugged-in 22Na based slow positron beam section in the Beijing intense slow positron beam line with which we can supply continuous slow positron beam for debugging of newly-built positron annihilation measurement systems and saving running time of the Beijing intense slow positron beam. The plugged-in 22Na based slow positron beam section includes positron source(22Na), positron moderator, E×B slow positron energy filter, multilevel electrostatic acceleration tube, radioprotection, magnetic transport system and vacuum system, etc. The new slow positron beam line will be running on April, 2006.
  • 加载中
  • [1] . YU Run-Sheng, WANG Bao-Yi, MA Chuang-Xin et al.HEP NP, 2001, 25(Supp.): 135(in Chinese)(于润升, 王宝义, 马创新等. 高能物理与核物理, 2001; 25(增刊): 1352. CAO Xing-Zhong, WANG Bao-Yi, WEI Long et al. Nu-clear Techniques, 2004, 27: 435(in Chinese)(曹兴忠, 王宝义, 魏龙等. 核技术, 2004. 27: 435)3. CAO Xing-Zhong, WANG Bao-Yi, YU Run-Sheng et al.HEP NP, 2004, 28: 560-565(in Chinese)(曹兴忠, 王宝义, 于润升等. 高能物理与核物理, 2004; 28:560-565)4. WANG Bao-Yi, CAO Xing-Zhong, WEI Long et al. Mate-rials Science Forum, 2004, 445-446: 5135. MA Yan-Yun, PEI Shi-Lun, CAO Xing-Zhong et al. HEP NP, 2006, 30: 166-170(in Chinese)(马雁云, 裴士伦, 曹兴忠等. 高能物理与核物理, 2006, 30: 166-170)6. WANG Hua-Jun. Journal of Sichuan Institute of Light In-dustry and Chemical Technology, 1999, 12(4): 23-25(in Chinese)(王华军. 四川轻化工学院学报, 1999, 12(4): 23-25)7. ZHANG Zhi-Ming, WANG Bao-Yi, MA Chuang-Xin etal. Nuclear Electronics Detection Technology, 2004, 24:490-491(in Chinese)(章志明, 王宝义, 马创新等. 核电子学与核探测技术, 2004. 24: 490-491)8. HE Chun-Qing, Eisaku Hamada. Nuclear Instruments andMethods in Physics Research, 2003, B211: 571-5769. YU Run-Sheng, WEI Long, WANG Bao-Yi et al. Nucl. In-strum. Methods, 2001, A419: 457/1-210. YU Run-Sheng. Construction of Slow Positron Beam Linesand Investigation of the Relative Techniques. Ph. D Dis-sertation of CAS. Beijing: Institue of High Energy Physics,2001. 29-39(in Chinese)(于润升. 慢正电子束流装置的研制及相关技术研究. 中国科学院博士论文, 北京: 中国科学院告能物理研究所, 2001. 29-39)11. Hutchins S M, Goleman P G et al. J. Phys. E: Sci. Instrum.,1986, 19: 282-28312. DU Bing-Chu, WANG Jian-Ru. Electro-optics. Beijing: Tsinghua University Press, 2002. 280-281(in Chinese)(杜秉初, 汪键如. 电子光学. 北京:清华大学出版社, 2002. 280-281)
  • 加载中

Get Citation
WANG Ping, CAO Xing-Zhong, MA Yan-Yun, QIN Xiu-Bo, WANG Bao-Yi, MA Chuang-Xin and WEI Long. Design and Construction of the Plugged-in 22Na Based Slow Positron Beam Facility[J]. Chinese Physics C, 2006, 30(10): 1036-1040.
WANG Ping, CAO Xing-Zhong, MA Yan-Yun, QIN Xiu-Bo, WANG Bao-Yi, MA Chuang-Xin and WEI Long. Design and Construction of the Plugged-in 22Na Based Slow Positron Beam Facility[J]. Chinese Physics C, 2006, 30(10): 1036-1040. shu
Milestone
Received: 2006-01-24
Revised: 2006-03-07
Article Metric

Article Views(3274)
PDF Downloads(689)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Design and Construction of the Plugged-in 22Na Based Slow Positron Beam Facility

    Corresponding author: WANG Ping,
  • Key Laboratory of Nuclear Analysis Techniques, Institute of High Energy Physics, CAS, Beijing 100049, China2 Graduate University of Chinese Academy of Sciences, Beijing 100049, China

Abstract: The Beijing intense slow positron beam facility has restricted running time of the BEPC-LINAC designed for BES and BSRF operation, We have therefore designed and constructed the plugged-in 22Na based slow positron beam section in the Beijing intense slow positron beam line with which we can supply continuous slow positron beam for debugging of newly-built positron annihilation measurement systems and saving running time of the Beijing intense slow positron beam. The plugged-in 22Na based slow positron beam section includes positron source(22Na), positron moderator, E×B slow positron energy filter, multilevel electrostatic acceleration tube, radioprotection, magnetic transport system and vacuum system, etc. The new slow positron beam line will be running on April, 2006.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return