[1] |
WANG Qing-Bin
, Kazuyoshi Masumoto
, Hideo Hirayama
, Tokushi Shibata
. A Measurement of the Residual Radioactivity with NaI Survey Meter and Its MC Simulation. Chinese Physics C,
2007, 31(11): 1071-1075. |
[2] |
HUANG Tian-Heng
, SUN Zhi-Yu
, XU Hu-Shan
, ZHAN Wen-Long
, ZHENG Chuan
, ZHANG Xue-Heng
, HU Zheng-Guo
, XIAO Zhi-Gang
, GUO Zhong-Yan
, XIAO Guo-Qing
, ZHANG Hong-Bin
, YUAN Xiao-H
,
,
,
. Construction and Test of Wien-Filter Combined with RIBLL. Chinese Physics C,
2007, 31(7): 669-673. |
[3] |
CHEN Yan-Wei
, WANG Shu-Hong
, PEI Guo-Xi
, LIU Wei-Bin
, YE Qiang
. Beam Commissioning of BEPCII Injector Linac. Chinese Physics C,
2006, 30(6): 562-565. |
[4] |
ZHANG Jin-Quan
, LI Zhi-Hui
, SONG Ming-Tao
, YIN Quan-Min
, ZHAO Hong-Wei
. Study of Buncher Efficiency in Axial Injection System of SFC. Chinese Physics C,
2006, 30(8): 788-791. |
[5] |
YANG Xue-Qing
, FANG Jia-Xun
, GUO Zhi-Yu
, CHEN Jia-Rong
. Matching Design Method for High Intensity RFQ Accelerators. Chinese Physics C,
2006, 30(S1): 19-21. |
[6] |
ZHANG Tian-Jue
, LI Zhen-Guo
, CHU Cheng-Jie
, WANG Xiu-Long
, ZHOU Zheng-He
. 100 MeV High Intensity Proton Cyclotron as a Driving Accelerator for Radioactive Ion Beam Facility. Chinese Physics C,
2006, 30(S1): 159-161. |
[7] |
HUANG Wen-Xue
, WANG Yue
, ZHU Zhi-Chao
, TIAN Yu-Lin
, XU Hu-Shan
, SUN Zhi-Yu
, XIAO Guo-Qing
, ZHAN Wen-Long
. Experimental Study of the High-Voltage Breakdown and Simulations for the RFQ Cooler and Buncher RFQ1L. Chinese Physics C,
2006, 30(S2): 261-264. |
[8] |
LI Qiang
. Measurement of Lineal Energy Spectra at Different Penetration Depths Along a Radioactive 9C-Ion Beam. Chinese Physics C,
2005, 29(11): 1041-1046. |
[9] |
OUYANG Hua-Fu
, FU Shi-Nian
, GUAN Xia-Ling
, XU Wen-Wu
. Study on the Design of an Intense-Beam RFQ with Stabilization. Chinese Physics C,
2004, 28(7): 753-757. |
[10] |
XING Qing-Zi
, LIN Yu-Zheng
, FU Shi-Nian
, FANG Shou-Xian
. Study of Simultaneous Acceleration of Positive and Negative Ion Beams by Dynamic Simulation in RFQ. Chinese Physics C,
2004, 28(6): 659-663. |
[11] |
HUANG Gang
, CHEN Huai-Bi
, HUANG Wen-Hui
, TONG De-Chun
, LIN Yu-Zheng
, ZHAO Zhen-Tang
. Development of a Longitudinal Feedback Cavity for the Beam Feedback System. Chinese Physics C,
2003, 27(12): 1138-1141. |
[12] |
XING Qing-Zi
, FU Shi-Nian
, LIN Yu-Zheng
, FANG Shou-Xian
. Calculation of Beam Acceptance for RFQ Accelerators. Chinese Physics C,
2003, 27(7): 628-632. |
[13] |
WANG Meng
, WANG Jian-Song
, GUO Zhong-Yan
, XIAO Guo-Qing
, ZHAN Wen-Long
, LI Jia-Xing
, SUN Zhi-Yu
, CHEN Zhi-Qiang
, WANG Wu-Sheng
, TIAN Wen-Dong
, MAO Rui-Shi
. Isospin Effects on the Yield of LCPs in the Reaction of RNB. Chinese Physics C,
2002, 26(8): 803-808. |
[14] |
SONG Ming-Tao
, YANG Xiao-Dong
, XIA Jia-Wen
, ZHAN Wen-Long
. Radioactive Ion Beam Line of CSR. Chinese Physics C,
2001, 25(5): 443-447. |
[15] |
Guo Zhongyan
, Zhan Wenlong
, Sun Zhiyu
, Xiao Guoqing
, Jiang Shanhong
, Li Jiaxing
, Meng Xiangwei
, Wang Jinchuan
, Zhang Wansheng
, Qin Lijun
, Wang Quanjin
. RIBLL Beam Diagnostics. Chinese Physics C,
1999, 23(3): 237-243. |
[16] |
Sun Zhiyu
, Zhan Wenlong
, Guo Zhongyan
, Xiao Guoqing
, Jiang Shanhong
, Li Jiaxing
, Wang Jinchuan
, Meng Xiangwei
, Zhang Wansheng
, Qin Lijun
, Wang Quanjin
. Control System of RIBLL. Chinese Physics C,
1999, 23(3): 298-301. |
[17] |
Luo Zihua
, Wang Shuhong
. Design and Study of Beam Dynamics for the BPL-RFQ. Chinese Physics C,
1995, 19(7): 658-666. |
[18] |
WANG Shu-Hong
. RFQ's Beam Dynamics and RF Structure. Chinese Physics C,
1993, 17(4): 310-321. |
[19] |
NI Hui-Ling
, JIANG Chun-Hua
, ZHOU Hua-Shi
, GUO Hong-Fei
, XU Jian-Guo
, ZHU Qi-Ming
, WANG Fang
, LUI Wei
, LI Jia-Hua
. TEST AND CALIBRATION OF THE DETECTORS OF THE BES LUMINOSITY MONITOR. Chinese Physics C,
1989, 13(10): 870-878. |
[20] |
Wei Kai-yu
. THE PARAMETERS AND ELECTRICAL TOLERANCE ANALYSIS FOR THE SINGLE BUNCHER SYSTEMS. Chinese Physics C,
1980, 4(6): 706-714. |