Simulation of beam size multiknobs correction at the Accelerator Test Facility 2 at KEK

Get Citation
BAI Sha and GAO Jie. Simulation of beam size multiknobs correction at the Accelerator Test Facility 2 at KEK[J]. Chinese Physics C, 2011, 35(4): 397-401. doi: 10.1088/1674-1137/35/4/014
BAI Sha and GAO Jie. Simulation of beam size multiknobs correction at the Accelerator Test Facility 2 at KEK[J]. Chinese Physics C, 2011, 35(4): 397-401.  doi: 10.1088/1674-1137/35/4/014 shu
Milestone
Received: 2010-07-07
Revised: 1900-01-01
Article Metric

Article Views(2376)
PDF Downloads(481)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Simulation of beam size multiknobs correction at the Accelerator Test Facility 2 at KEK

Abstract: The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose of reaching a 37 nm vertical beam size at the interaction point (IP). During the initial commissioning, we started with larger-than-nominal β-functions at the IP in order to reduce the effects from higher-order optical aberrations and thereby simplifying the optical corrections needed. We report on the simulation studies at two different IP locations developed based on waist scan, dispersion, coupling and β function multiknobs correction in the large β optics of ATF2, in the presence of two kinds of magnet inaccuracies (quadrupole gradient and roll errors) to generate all possible linear optic distortions at the IP. A vertical beam size which is very close to the nominal beam size is obtained based on the simulation study.

    HTML

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return