Design and construction of the MEBT1 for CADS injector scheme II

Get Citation
JIA Huan, HE Yuan, YUAN You-Jin, SONG Ming-Tao, HUANG Shi-Chun, ZHANG Xiang, YUAN Chen-Zhang, NIU Hai-Hua, ZHANG Peng, WU Jun-Xia, ZHANG Yong, KANG Xin-Cai and LUO Chen. Design and construction of the MEBT1 for CADS injector scheme II[J]. Chinese Physics C, 2015, 39(10): 107003. doi: 10.1088/1674-1137/39/10/107003
JIA Huan, HE Yuan, YUAN You-Jin, SONG Ming-Tao, HUANG Shi-Chun, ZHANG Xiang, YUAN Chen-Zhang, NIU Hai-Hua, ZHANG Peng, WU Jun-Xia, ZHANG Yong, KANG Xin-Cai and LUO Chen. Design and construction of the MEBT1 for CADS injector scheme II[J]. Chinese Physics C, 2015, 39(10): 107003.  doi: 10.1088/1674-1137/39/10/107003 shu
Milestone
Received: 2015-01-23
Revised: 1900-01-01
Article Metric

Article Views(1645)
PDF Downloads(99)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Design and construction of the MEBT1 for CADS injector scheme II

    Corresponding author: JIA Huan,
    Corresponding author: HE Yuan,

Abstract: A Medium Energy Beam Transport line 1 (MEBT1) has been designed for Injector Scheme II of the China ADS project. To match the beam from RFQ to Superconducting (SC) Half Wave Resonator (HWR) sections with emittance preservation, the MEBT1 has been designed to be mechanically compact. Working at 162.5 MHz, the MEBT1 transports a 10 mA, 2.1 MeV proton beam using seven quadrupoles and two bunching cavities within 2.7 meters. Three collimators are placed between every two adjacent quadrupoles to collimate the beam halo. Design and construction of the MEBT1 are presented in this paper.