A Test Beam Upgrade Based on the BEPC-LINAC

  • A total of three beam lines, E1,E2 and E3 have based on the LINAC of BEPC. The E1 beam is to be used for intense slow–positron facility. The E2 is a primary positron or electron beam with an energy of 1.3—1.5GeV. the E3 is a secondary electron or pion test beam with a momentum can be adjustable continuously. The position accuracy of a detected particle is 0.2—0.4mm with an event rate of 3—4Hz.This beam has been successfully used for some detectors beam test.
  • 加载中
  • [1] MA Ji-Mao, MAO Ze-Pu, MAO Hui-Shun et al. HEPNP, 1987,11(4):441—450(in Chinese)(马基茂,毛泽普,毛慧顺等.高能物理与核物理,1987,11(4):441—450)2 L Jun-Guang et al. HEPNP, 1999,23(6):505—511(in Chinese)(吕军光等.高能物理与核物理,1999,23(6):505—511)3 LIU Nian-Zong, ZHANG Cai-Di, ZHENG Lin-Sheng et al. HEPNP ,1992,16(11):995—977(in Chinese)(刘念宗,张彩娣,郑林生等.高能物理与核物理,1992,16(11):995—997)4 BANFORD A P. The Transport of Charged Particle Beams, 1984,120—128(in Chinese)([英]A .P .班福德著.刘经之等译,带电粒子束的输运,1984,北京:原子能出版社,120—128)5 LI Jia-Cai, ZHANG Liang-Sheng et al. HEPNP, 2005,29(1)(in Chinese)(李家才,张良生等.高能物理与核物理,2005,29(1))6 LIU Zheng-Quan, CUI Xiang-Zong, LI Jia-Cai. NEDT, will be published in 2004(in Chinese)(刘正全,崔象宗,李家才核电子学与探测技术,2004,待发表)7 CUI Xiang-Zong, LI Jia-Cai, ZHAO Xiao-Jian et al. HEPNP, 2004,28(8):870(in Chinese)(崔象宗,李家才,赵小健等.高能物理与核物理,2004,28(8):870)8 SHEN Ji, CHEN Zi-Yu YE Zhen-Yu et al. Journal of University of Science and Technology of China,2004,34:(in Chinese)(沈激,陈子瑜,叶震宇等.中国科学技术大学学报,2004,34:)br9 SHEN Ji, CHEN Zi-Yu, YE Zhen-Yu et al. NEDT, 2004,24(6)(in Chinese)(沈激,陈子瑜,叶震宇等.核电子学与探测技术,2004,24(6))10 Tsai Y S, Van Whitis. Physical Review, 1968,149:1248—1257br11 Amaldi E, Fubini S, Furlan G. Pion-Electroproduction. New York:Springer-Verlag, 1979.1—812 FUJII T, KONDO T, TAKASAKI F et al. Nuclear Physics, 1977,B120:395—422
  • 加载中

Get Citation
LI Jia-Cai1, WU Yuan-Ming1, CUI Xiang-Zong1, ZHANG Liang-Sheng1, ZHOU Bao-Qing1, LIU Zheng-Quan1, ZHANG Shao-Ping1, LIU Shi-Xing2, SUN Chang-Chun1, SHEN Ji2, YIN Ze-Jie2, ZHANG Yong-Ming<sup, A Test Beam Upgrade Based on the BEPC-LINAC[J]. Chinese Physics C, 2004, 28(12): 1269-1277.
LI Jia-Cai1, WU Yuan-Ming1, CUI Xiang-Zong1, ZHANG Liang-Sheng1, ZHOU Bao-Qing1, LIU Zheng-Quan1, ZHANG Shao-Ping1, LIU Shi-Xing2, SUN Chang-Chun1, SHEN Ji2, YIN Ze-Jie2, ZHANG Yong-Ming<sup, A Test Beam Upgrade Based on the BEPC-LINAC[J]. Chinese Physics C, 2004, 28(12): 1269-1277. shu
Milestone
Received: 2004-04-05
Revised: 1900-01-01
Article Metric

Article Views(2823)
PDF Downloads(635)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

A Test Beam Upgrade Based on the BEPC-LINAC

    Corresponding author: LI Jia-Cai1,
  • Institute of High Energy Physics,CAS,Beijing 100049,China2 Department of Modern Physics,University of Science and Technology of China,Hefei 230027,China

Abstract: A total of three beam lines, E1,E2 and E3 have based on the LINAC of BEPC. The E1 beam is to be used for intense slow–positron facility. The E2 is a primary positron or electron beam with an energy of 1.3—1.5GeV. the E3 is a secondary electron or pion test beam with a momentum can be adjustable continuously. The position accuracy of a detected particle is 0.2—0.4mm with an event rate of 3—4Hz.This beam has been successfully used for some detectors beam test.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return